How you can Improve The Productivity Of Ball Mill

Our factory crushing equipment is a 400 ÃaE 600 jaw crusher, two ÏaE800 ÃaE 600 hammer crusher. A relieve materials up to 40 mm, the 2 basic powder, one of the largest particle size only 15 mm. I plant the development rules of order ÏaE800 ÃaE 600 hammer crusher screen bar spacing of 10 to 12 mm in the device to guarantee the granularity of the Cheap air max 90 material into the mill. Shrink into the ground particle size of the case; earnestly strengthen the fundamental work, such as the moisture of the material into the grinding influence the important thing to improve the mill output, control material into the grinding water within 1.5 to1.8%.2. Strengthen grinding medium management, improve grinding ability(1). B650 belt machine; (2). Raw material warehouse; (3). ÏaE 3.5 meters centrifugal separator can; (4). GX400 thick to powder spiral machine;( 5). ÏaE 2.2 x 6.5 meters ball mill; (6). GX500 spiral machine; (7). GX500 spiral machine;( 8). D350 ascend machine; (9). Raw library; (10). GX500 spiral machine; (11). HL500 ascend machine; (12). Pull tracheal; (13). Injection convulsions device3 mill ventilation, reducing material over-grinding phenomenonA self-designed and produced in the trachea of pulling additional injection ventilationdevice to solve air max 95 shoes the over-grinding phenomenon of materials and improve production quality.4. Enhance the structure; enhance the circulation rate from the powderWhen the mill production ranged from 21 to 24 tons / every once in awhile, we found thatÏaE3.5 m Centrifugal Separator capacity isn’t enough, the Fineness only 7 to 8% (0.080 mm sieve), alterations in the scope of We do the next two improvements: (1) Caesar materials cover the majority of diameter smaller highly Bianai. (2) the number of small bladesfrom eight to four symmetrical. Improved the merchandise fineness could be adjusted between10 to 12 percent. Requirements by calcinations, fineness of raw materials finished products control about 10%, the cyclic loading rate from the powder from 200% to 300%, so that the ball mill, ale the powder to complement.5. Change transportation equipment, and increase transmission capacityThe ball mill unloading the initial supporting D350 hoist, designed capacity for 42 m 3 /, actual use less than can need. Through calculation, we designed the HL500 hoist hopper, the cabinet, the transmission constant, only the tape round to chain wheel, tape change for the chain, underneath the same axis (round by cheap air max 95 the same size when when), is a new design for recycleables in the hopper, transmission and lower that designed a few minor adjustments, less investment, quick effect, high quality.ÂUsing its top quality products such as Mineral sand washerãaAHenan Hongxing mining machinery Co.Ltd has ascended right in front rank of the world within the exporting of mining equipments.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>